We have a new agreement to perform the following tasks:
Execution of construction works and preparation of an executive design, implementation of construction works for the installation of railway traffic control devices, railway telecommunications network equipment, along with post-warranty services for these devices in the area Vistula Bridge – Czechowice-Dziedzice – Zabrzeg as part of the project „Works on the primary passenger lines (E 30 and E 65) in the area of Silesia, Stage I: Line E 65 on the section Będzin – Katowice – Tychy – Czechowice-Dziedzice – Zebrzydowice, LOT C section Vistula Bridge – Czechowice Dziedzice – Zabrzeg
Ordering Party: Budimex S.A.
Implementation period: 2019-2023
The scope of the works includes:
• comprehensive replacement of the existing overhead line of approx. 60 km,
• implementation of collective structure bonding in an open circuit configuration.