{"id":990726,"date":"2017-07-31T12:46:27","date_gmt":"2017-07-31T10:46:27","guid":{"rendered":"https:\/\/trakcjasystem.pl\/services\/"},"modified":"2024-09-23T14:08:01","modified_gmt":"2024-09-23T12:08:01","slug":"services","status":"publish","type":"page","link":"https:\/\/trakcjasystem.pl\/en\/services\/","title":{"rendered":"Services"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<h2>\n\tOur <br \/><strong>services<\/strong>\n\t<\/h2>\n\t<p>We offer a comprehensive range of specialised construction and design services in the area of railway power supply systems.<\/p>\n<h2>\n\t<strong>Design<\/strong>\n\t<\/h2>\n\t<p>We provide services related to the design of railway power supply systems, in terms of:<\/p>\n<ul>\n<li>overhead contact line.<\/li>\n<li>electrical power systems up to 1kV,<\/li>\n<li>lighting,<\/li>\n<li>electric turnout heating,<\/li>\n<li>low voltage network (20 kV) non-contact line requirements,<\/li>\n<li>railway power supply systems up to 30 kV,<\/li>\n<li>local control of overhead line disconnectors,<\/li>\n<li>signalling and railway traffic control.<\/li>\n<\/ul>\n\t<p>We carry out design projects using modern CAD software. The projects meet the applicable technical and legal regulations, engineering knowledge principles, and requirements of construction laws.<\/p>\n<h2>\n\t<strong>Implementation<\/strong>\n\t<\/h2>\n\t<p>We comprehensively provide specialised construction services in the area of railway power supply networks.<\/p>\n<h3>\n\tRailway overhead contact lines\n\t<\/h3>\n\t<ul>\n<li>foundation works,<\/li>\n<li>installation of supporting structures,<\/li>\n<li>installation of overhead contact lines,<\/li>\n<li>installation of a return network,<\/li>\n<li>installation of track bondings,<\/li>\n<li>low voltage network installation works on overhead line supporting structures.<\/li>\n<\/ul>\n<h3>\n\tElectrical power networks\n\t<\/h3>\n\t<ul>\n<li>construction and rebuilding of electric heating of turnouts,<\/li>\n<li>construction and reconstruction of external lighting of railway areas,<\/li>\n<li>low-voltage and high-voltage conflicts,<\/li>\n<li>construction and reconstruction of lines, local control devices and overhead line disconnectors,<\/li>\n<li>construction and reconstruction of power supply lines for traction networks.<\/li>\n<\/ul>\n<h3>\n\tSignalling and railway traffic control, telecom networks\n\t<\/h3>\n\t<ul>\n<li>construction of station and line equipment,<\/li>\n<li>installation of crossing facilities,<\/li>\n<li>phasing of works (for traffic control equipment),<\/li>\n<li>installation of teletechnical infrastructure<strong>.<\/strong><\/li>\n<\/ul>\n<h2>\n\t<b>Machinery <\/b> fleet\n\t<\/h2>\n\t<p>The Trakcja System hardware base includes several dozen specialized devices, machines and vehicles used to perform complex traction work.<\/p>\n\t<a href=\"https:\/\/trakcjasystem.pl\/en\/park-maszynowy\/\" target=\"_self\" role=\"button\" rel=\"noopener\">\n\t\t\t\t\tCheck out our equipment\n\t<\/a>\n\n<\/div><!-- .vgblk-rw-wrapper -->","protected":false},"excerpt":{"rendered":"<p>Our services We offer a comprehensive range of specialised construction and design services in the area of railway power supply systems. Design We provide services related to the design of railway power supply systems, in terms of: overhead contact line. electrical power systems up to 1kV, lighting, electric turnout heating, low voltage network (20 kV)&#8230;<\/p>\n","protected":false},"author":1,"featured_media":987915,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-990726","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/pages\/990726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/comments?post=990726"}],"version-history":[{"count":1,"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/pages\/990726\/revisions"}],"predecessor-version":[{"id":991533,"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/pages\/990726\/revisions\/991533"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/media\/987915"}],"wp:attachment":[{"href":"https:\/\/trakcjasystem.pl\/en\/wp-json\/wp\/v2\/media?parent=990726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}